Chapter 409 Solving Problems
"Manager Xue, how effective is this odorproof floor drain?" Liu Mo'ang wore a hard helmet and asked Xue Liqiang beside him.
Xue Liqiang is the manager of the decoration company of Riguang City Local Construction Group. He is responsible for the interior and exterior decoration of the Tianlu Inn Hot Spring Resort, the main building, twenty-eight high-end single-house courtyards, thirty-six mid-range townhouses, and the interior and exterior decoration projects of the staff dormitory building.
"Don't worry, Mr. Liu, the odorproof floor drains we use are all brand-name products and are shipped directly from the manufacturer. This is also stated in our contract, and we will not use inferior products as good ones." Xue Liqiang answered seriously.
This 35-year-old man is a very responsible leader. Since all the civil engineering projects of the resort were completed in mid-October, his decoration company has settled here.
During the past twenty days, Liu Mo'ang came to the construction site almost every day, and he was still very satisfied with Xue Liqiang's work.
Thanks to sufficient funds, the resort's civil engineering is progressing very quickly. As for the same, in our infrastructure units in China, as long as the funds are in place, they will do everything quickly.
Of course, this is not directly related to the overall civil engineering of the hot spring resort.
After all, Sunshine City Local Construction Group is a large infrastructure group. The resort project is a large project that Zhou Haipeng, Danzengjeb and others cannot afford, but it is nothing for a large infrastructure group of this scale.
The main buildings of the hot spring resort are less than 25,000 square meters of building area, and these buildings are not high-rise buildings, even the highest main building is only five floors! This is too EASY to live in front of a large construction group.
Therefore, the local construction group completed all civil engineering projects in just over three months.
"Manager Xue, it's not that I'm picking up the problem. It's really not that the odorproof floor drain in the bathroom in this room is inconspicuous, but if it doesn't work well, it will greatly affect the living senses. I'm not afraid of spending money, I just want the best one."
"I understand this very well. So the odorproof floor drains we use are all brand-name products, and they all have inspection certificates. After the decoration is completed, if there is a odor in the guest room, we will be responsible."
"I'm relieved." Liu Mo nodded.
Although this odorproof floor drain is inconspicuous, it is extremely important for a hotel. Liu Mo'ang's family owns a hotel, how could he not know about this?
In fact, his seven-day hotel has suffered such a loss before.
That was when Liu Mo'ang was still in junior high school. His seven-day hotel was renovated once, but the odorproof floor drain changed was not up to standard, and there was always a faint smell in the room. Especially when the north wind blew, the smell in the room became even more intense. If a person stayed in the room for a while, it would be sour and refreshing.
For this reason, Liu Dahe had to smash all the floor drains and replace them again.
Moreover, Liu Mo'ang heard from Li Junyi that Li Junyi said that when traveling and staying on the plateau, it would be better if you were in big cities like Sunac City, Bayi, and Houzang, but if you were staying in remote counties or towns, it would be better not to choose a standard room with independent bathrooms.
Why? The reason is very simple, that is, in hotels in such remote areas, there are many hotel rooms that have problems with odorproof floor drains. Don’t think that spending two or three hundred or even three or four hundred to one standard room makes you look so tall, rich and sophisticated. After you move in, once you encounter problems with odorproof floor drains, it is definitely you who are sour.
On the contrary, the public bathroom room is better!
(PS: This is Lao Mo's experience. If you have book friends who want to travel to the plateau, especially those who travel to remote places like Ali and Nagqu, it is best to believe Lao Mo.)
Now every time Liu Mo'ang takes Chu Qian out, as long as he stays, the first thing he has to do is to go into the guest room, especially the bathroom in the guest room, and smell whether there is any odor. As long as there is a trace of odor, even if the hotel doesn't have money to let him live in for free, he will not stay there.
Now that our own hot spring resort is about to be renovated, there must be no problems in this regard, otherwise it will be the signature of Tianlu Inn!
After receiving Xue Liqiang's guarantee, Liu Mo'ang was relieved.
"Manager Xue, when will this renovation work be carried out?"
"Mr. Liu, I can't guarantee this. It depends on the temperature. You know, if there is heavy snow here, the temperature will drop by several degrees or even more than ten degrees. If the temperature is too low, it will definitely not be able to decorate. Now it is November, and the decoration work will have to stop until mid-December at the latest. As for the coming year, at least it will take until March to continue the decoration."
Liu Mo'ang was also very scratching his head. After all, he couldn't control the temperature. Even if he could do this with the small world of the Five Elements, he couldn't do it. Just kidding, the weather is cold and the earth is frozen elsewhere, but you are as warm as spring. Isn't this giving yourself eye drops?
"Manager Xue, what if I were to provide heating first?" A thought suddenly appeared in Liu Mo'ang's mind.
"Heating first?" Xue Liqiang was stunned, "How to heat first?"
"Well..." Liu Mo'ang pondered for a moment, and the thought in his mind became clearer and clearer. Then he said: "You know I have six hot springs here, one of which is specially used to heat the inn, mutual aid company and stargazing house. At first, I planned to wait until the hot spring resort was built before heating here, but what if I start heating now?"
"This..." Xue Liqiang frowned and thought, "Mr. Liu, if the temperature in the room can be kept above ten degrees, then he can continue working even in winter. But the question is how to do this? It's easy to say during the day, but the lowest temperature at night is now lower than minus ten degrees..."
"Well, I mean that. When your group was doing civil engineering, I arranged for someone to lay the heating pipes here. The main building, high-end villas and mid-range villa areas have been laid. I mean to stop other decoration work first, and we will start laying indoor heating pipes. Floor tiles and other things have already come in, there are cement and sand, and there are also floor heating pipes. Let's lay the indoor floor heating first, lay the floor tiles on it, and after the floor tiles are completely solidified, we will heat the room! Well, because the doors and windows are not in place yet, we can temporarily block the doors and windows with some quilts. In this way, once the floor heating is heated, even if there is some air leakage, the temperature in the room can be kept at least ten degrees, right?"
Xue Liqiang scratched his scalp, "Mr. Liu, I think this method is feasible, but in this way, the project cost will be increased accordingly. After all, the decoration is in sequence, and everything you do first and then is arranged. Now suddenly disrupting this order will have a certain impact on the subsequent decoration. Moreover, because laying the floor tiles first may cause damage to the already paved floor tiles in the subsequent decoration process. If replaced, it will be an additional expense."
"What if I don't lay bricks for now, just lay the cement?"
"This is definitely not possible! There are regulations for laying floor heating. The backfill layer of floor heating is usually integrated with the cement slurry layer of floor tiles. If the backfill layer is first laid and then the floor tiles are laid, the overall thickness will increase a lot, which will affect the final heating effect..." After Xue Liqiang explained to Liu Mo'ang professionally why he could not do this, Liu Mo'ang realized that he was a little too presumptuous.
"Then don't worry about those things. First, hurry up and install floor heating first." Liu Mo'ang patted the board without hesitation. For the resort, this winter is very important. If the resort can be renovated in this winter, then when the guests start to get in, there will be rooms to live in, so as to avoid the embarrassing situation of having guests but not being able to receive them again.
"If you go back, make a change immediately, and ask the supervisor to sign and come to me directly. I will sign and approve the funds immediately." Since he made the decision, Liu Mo'ang has never been a sluggish person.
Xue Liqiang also likes such a generous party. After all, the change in project volume is not a small amount. If another party is replaced, most of them will probably not spend more money.
So Xue Liqiang thought about it and said again: "Mr. Liu, you don't have to be so anxious. I just thought about it and felt that there is a way to save money to try it."
"I'll listen if you say it." Liu Mo'ang nodded.
"Anyway, as the temperature continues to decrease in a few days, the exterior will definitely not be able to be carried out, so I plan to transfer all the exterior workers to the interior side, and the exterior will be temporarily stopped. Then everyone will make a running construction plan. For example, I can divide all the workers into three parts. The first part starts to install water and electricity from Room 1 on the first floor and do waterproof lamps, and the second part lays floor heating behind. As for the third part, the windows will be installed from the second floor! In this way, after the water and electricity on the first floor are installed, the floor heating will be almost installed. When the workers in the first and second parts go to work on the second floor, the windows on the second floor will be installed, so that there is no need to block the windows with quilts or something from the second floor. Moreover, the construction order of the floor from the second floor will not need to be changed, which will save you a lot of money."
After Xue Liqiang said this, Liu Mo'ang immediately understood what was going on.
"Okay, then as you said, you can put the outerwear first. Anyway, the outerwear project is not very large. At worst, the outerwear will start after March next year, so that at least it will not delay tourists' check-in. Just as you said, concentrate on getting the innerwear done first!"
PS: Bow and thank the big boss "Chunlong" for his red reward!
Chapter completed!