Section 458 Refit begins
There is one more.
Yes, there is one more.
"Yes." Zhuang Zhonghua slapped his thigh: "Yes, we have a five-wheeled car, but I heard that some malfunctions are as if they were on the engine."
"Yes, yes." Ma Dafu also reacted. "Niu Fendou's one, yes, his one was parked in the tractor warehouse."
Zhuang Zhonghua added: "The engine is a bit malfunctioning."
They received Ding Er's order to cooperate with Factory No. 9, which requires one or more five-wheeled vehicles. Then the security work must be handled by Director Xu Zhengyang of Factory No. 9.
They don’t have to worry about the rest, spending money or something.
If you want people to give them, machinery to machines, and even if you seal the partition, you will be troubled by Factory Nine.
But, they don't know the truth...
When Jiong Shuisheng heard this, the engine was malfunctioning.
It doesn't matter.
We will remove any faults.
That night, the person in charge of the guards blocked the surrounding area. Jiong Shuisheng asked people to get started. He was two eighth-level workers and two seventh-level workers.
The two level 8 workers are from the Tianshan Construction Column and Han Jizong's apprentice.
Two seventh-level workers, one from Phoenix Mountain City and the other from Bazhou, were both asked Bai Hao to find a reason to borrow temporarily. In Pang Xinghua's words, these two are too young and have much better skills than Zhang Jianguo, and they are the kind of eight-level workers who have no certificates.
Demolition first.
The original engine was thrown directly into the corner of the garage, and then because the screws could not be screwed, the transmission was violently tidied down with an air cutting machine.
Then dismantle it again.
Bullet-out, dismantle.
Fuel tank, remove.
The position of the vehicle leader does not need to be removed.
In order to free up enough space for this new engine, as long as it has nothing to do with the power part, it will be completely removed.
There are five pairs of wheel chassis drawings in Factory 9, and this thing is not a confidential material.
When I was in the Ninth Factory, there was a renovation plan long ago.
It won't work without dismantling.
The engine alone is 1.7 meters long, 2 meters wide, and weighs more than two tons. In addition, there are quite a few gearboxes, and the cooling part has a volume of one cubic meter, weighing more than five hundred kilograms.
Jiong Shuisheng made this thing based on the sketch given by Bai Hao and a large number of external technologies.
The total volume is as high as four cubic meters.
It can be said that in the current state of Xia, except for the very small number of SDL-2, there is no big guy who can install other things after putting things in the chassis.
Demolition is the only solution.
Halfway through the removal, I felt that the steering device of the lid was a bit in the way, so I removed it.
Niu Fendou's beloved old guy, in just two hours, in addition to the five pairs of wheels, he even removed the driving position. Jiong Shuisheng had to change into a new driving method and the part with electronic control, so he also had to dismantle it. Only after the dismantle was dismantled, there was room for a new one.
Bai Hao is demolishing here.
Over there, Hei Yan circled around the imperial capital, and the plane did not even land and directly the commander of the Feitian Mountain Construction Column was located.
On the plane, Hei Huanxi, Chu Feiyang and Guo Chongyan, who originally wanted to take a flight, also went there.
Wu City.
The captain of the Tianshan Construction Column hurried to the airport to greet him.
After connecting, arrange the best guesthouse immediately.
Halfway through, Hei Yan asked: "I heard that Xia Guojiu Factory sent someone here."
"Yes, their people are now in Wucheng City, and there are also several headquarters in the six major regions, nine major regions, and second major regions, new plows, and related mechanical devices. They want to do a training. We have tried it, it's easy to use. There is still snow on the ground, which can plow half a meter deep."
"Oh! Look, the depth of the plow can increase the yield now."
Hei Yan asked his son, but Hei Huanxi didn't know what the Ninth Factory had done, and Bai Shan's mouth was very strict.
The captain Jiang Chengjie immediately replied: "You are right. We estimate that a mu of at least 30 kilograms will increase the yield per acre, which is a good thing. But time is tight, so part of the production is used quickly. Many of them are actually of the quality. So the Jiuchang sent someone to teach you how to use and how to repair it."
Hei Yan nodded silently.
Jiang Chengjie said again: "You always have a rest first. The weather will be good tomorrow. There is also an inspection team from the imperial capital. There will be a live demonstration at the headquarters of the six major districts in the north of Ukraine."
"Okay, let's arrange it. I'll take a look."
Where Heiyan lives, there is naturally hot water and heating.
Bai Hao lived a life of placing a floor again.
A few large stoves were heated up, and then I found a board in the garage, and the same was true for others.
When the Jiuchang was doing research, it was crazy.
The next day, the headquarters of the sixth district of the Beitianshan Construction Column in Wushi City.
The people who came to inspect the imperial capital only thought that Heiyan was very concerned about the spring plowing of the new year, and they also made relevant preparations.
The bull fight is also on the scene.
As a former meritorious five-pair wheel driver, now an excellent tractor driver, he was naturally selected to drive a new tractor and hang a new plow for everyone to demonstrate.
A slanted plow, two pairs of main and secondary plows.
The tractor started to move, and the frozen and hard, with a layer of snow on it was cut open like tofu blocks. Even the cows who drove the tractor felt a bit strange.
After less than ten meters of plowing, he stopped to check.
Several technicians also stepped forward.
The plow is fine.
Look at the field again.
This farming is excellent.
Someone asked: "Old Niu, why did you stop?"
Niu Fendou thought for a while: "I didn't feel that the machine was full of force, I thought I didn't hang the plow."
Hei Yan was also watching from a distance. Jiang Chengjie introduced: "This is the 9th Factory, please give a body in Xiaguoyitu in Shendu. It is carefully crafted according to the Dongfang-Red 70 crawler drawing. It is equipped with a new diesel engine from the 9th Factory, a big guy with 140 horsepower. I heard that there are 24, but there are still shortcomings to be improved."
At this time, the tractor in Xiaguo who has a tractor of 20 to 50 horsepower is called medium size. More than 50 horsepower is called large size, and less than 19 horsepower is called small size.
The Type 70 in front of you is a 70-horsepower tractor.
This thing is installed directly with a diesel engine with twice the power and reaching 140 horsepower. No wonder it was originally planned to hang two pairs of plowshares with a depth of 50 cm. It felt like the machine was not very strong.
After explaining to Heiyan, Jiang Chengjie asked: "The technicians in Factory 9 recommend hanging a few pairs of plows."
"Eight pairs, but our steel is not qualified, and the largest one is only six pairs of plowshares."
“Hang on.”
There is no pressure on the six pairs of plowshares, and everything goes very smoothly.
Niu Fendou laughed so hard that he couldn't close his mouth.
Unfortunately, there is only one large tractor. If there are many, I don’t know how many times faster it will be.
Jiang Chengjie was also thinking about this matter.
Use their original tractor to hang up to two pairs of plows.
Should I ask Xia Guoyituo to talk about it and customize a batch of new tractors using the new 140-pierre-male diesel engine in the Jiu Factory?
But the Diesel Engine Factory No. 9 also doesn’t produce it.
well!
With a slight sigh, Jiang Chengjie felt that he could use a new tractor, and no matter how soon it was, it would be next year.
Chapter completed!